Title report → review package → CAD

The drafting groundwork behind ALTA title review.

TitleDraft turns title commitments into source-linked Schedule B-II review notes, organized supporting documents, extracted text, and draft .dxf work products for licensed surveyor review.

One-time fee3 business daysPLS review required
ILLUSTRATIVE REVIEW PACKAGETD-24018

SCHEDULE B-II · EXCEPTION 12

Easement for utilities and access as set forth in instrument recorded as Document No. 2021-004812...

N 42°18'20" E · 85.40'

Document
Downloaded
Review state
Potentially plottable
Source
Page 14 · ¶12
TD_EASEMENTTD_CALLSTD_NOTES
N 42°18'20" E85.40'LOCAL ORIGIN · SOURCE UNITS: FEETDRAFT · PLS REVIEW REQUIRED

Source-linked

Exception numbers, recording references, page anchors, and supporting-document status stay attached.

Shows the work

Calls, source units, assumptions, closure, and residuals are included where drafting is supported.

Honest limits

Ambiguous, illegible, inaccessible, and non-plottable material remains visibly flagged.

What arrives

One organized package. Six useful layers.

Built to feel like the handoff from a careful junior title/CAD drafter—not a black-box AI summary.

01

Title text DXF

Schedule A or Exhibit A and Schedule B-II text organized for straightforward CAD placement.

02

Supporting-document archive

Accessible linked instruments downloaded and named by exception and recording reference.

03

OCR and extracted text

Searchable text from supporting documents, with illegible or uncertain passages called out.

04

PLTRAS spreadsheet

Exception-by-exception source, parties, instrument, type, document status, plottability, and notes.

05

Individual exception DXFs

One draft file per supported plottable exception, including calls, units, closure, and residuals.

06

Review memo

Missing documents, assumptions, ambiguity flags, and the items that need PLS judgment.

Source manifest · example

EX-07DOC 2018-77102TEXT ONLY
EX-08BOOK 194 · PG 18DOWNLOADED
EX-12DOC 2021-004812DRAFT DXF
EX-13LINK REQUIRES LOGINMISSING
EX-18DOC 2023-11009NEEDS REVIEW

Illustrative data only. The public site does not display or retain customer source text.

Built for review

The source trail is part of the deliverable.

A fast answer is only useful if your survey team can see where it came from. TitleDraft keeps document status, report anchors, calls used, and unresolved questions in the same package.

  • Every exception remains in the inventory—even informational and out-of-scope items.
  • Downloaded instruments keep a predictable offline naming scheme.
  • Potential geometry is separated from text-only and needs-review material.
  • No source means no invented linework.

Four stages

From report to review package.

See every step
  1. 01

    Intake & source check

    Confirm the report, linked instruments, jurisdiction, counts, and CAD preferences before payment.

  2. 02

    Exception workup

    Extract Schedule A and B-II text, build the PLTRAS table, and organize each supporting document.

  3. 03

    Draft CAD support

    Prepare individual DXFs only where the source supports drafting, including calls and closure information.

  4. 04

    PLS review package

    Deliver the source-linked folder, warnings, assumptions, spreadsheet, extracted text, and draft CAD.

Good fit

Survey teams that want the groundwork done.

Licensed survey firms, ALTA-related title workups, accessible instruments, and teams that want a documented draft package to review.

Not a fit

Requests for a professional determination.

Legal or title opinions, survey certification, boundary or easement determinations, recordable descriptions, or geometry where the source is missing or ambiguous.

FAQ

Before you send a report.

Read the full FAQ
Does TitleDraft decide whether an easement affects the property?+

No. TitleDraft organizes the source material and prepares draft work product. The responsible licensed professional decides legal effect, applicability, location, and what belongs on the survey.

What happens when an exception cannot be plotted?+

It stays visible as text-only, missing-document, ambiguous, or needs-review. Missing geometry is never invented to make the package look complete.

How quickly is a standard project delivered?+

The introductory standard is within three business days after payment and receipt of usable source files. We contact you if an inaccessible instrument or material scope issue changes that.

How are my files handled?+

Source files are stored privately, used to perform the service, and scheduled for deletion 30 days after delivery. Abandoned unpaid uploads are removed after seven days.

Introductory service · $200

Bring one real title project.

No account. No subscription. Scope is confirmed before payment.

Start the intake